|
|
|
PERMIT FEES FOR EXPLOITATION OF PRODUCTS IN PARK ESTATE
Note-
1.The fee fixed for each permit is chargeable regardless of whether any products to which the permit relates is collected.
2.Unless indicated no permit shall be issued for collection of products for commercial purposes.
3.Excluding specially protected species.
Fee Charged
|
Persons resident in Zimbabwe US$
|
Persons not resident in Zimbabwe US$ |
Barks, leaves and roots................
A bag limit of 1 kg per bag shall apply |
100.00 |
200.00 |
Seeds...........................................
A bag limit of 1 kg per day shall apply |
Quotation on request |
200.00 |
Seedlings per specimen
.....
quotation on request
Timber per cubic metre
Quotation on request
( Pine, Eucalyptus, Cypress , and Wattle Blackwood) Gravel, river sand and pit-sand can only be collected in designated areas.
(a) Gravel (per load) |
US$100.00 |
(b) River sand (per load)......................................... |
US$100.00 |
(c) Pit sand (per load)............................................. |
US$100.00 |
(d) Natural Stones.................................................. |
US$800.00/claim |
(e) Prospecting permit............................................. |
US$100.00 |
(f) Firewood (per cubic metre)................................ |
US$100.00 |
Mining Permits (All charges per Annum)
Initial Mining Inspection Fee …………………………………………… US$500.00
Gold Mining
Small Scale/active claim.......................................... |
US$1,000.00 |
Medium Scale /active claim..................................... |
US$2,000.00 |
A claim not being used............................................ |
US$625.00 |
Chrome Mining
Small Scale/active claim......................................... |
US$1,000.00 |
Medium Scale/active claim..................................... |
US$2,000.00 |
A claim not being used........................................... |
US$625.00 |
Tantalite Mining
Small Scale/active claim......................................... |
US$1,000.00 |
Medium Scale/active claim..................................... |
US$2,000.00 |
A claim not being used........................................... |
US$625.00 |
Precious Minerals e.g. Diamond, Platinum
Small Scale/active claim......................................... |
US$2,000.00 |
Medium Scale/active claim..................................... |
US$4,000.00 |
A claim not being used........................................... |
US$1,000.00 |
Other Minerals
Small Scale/active claim......................................... |
US$1,000.00 |
Medium Scale/active claim..................................... |
US$2,000.00 |
A claim not being used........................................... |
US$625.00 |
Note-
1.A load shall consist of 5 cubic metre per truck and will only be collected from designated areas.
2.Removal of stones from the Estate is prohibited.
3.Miners with established mines within Parks and Wildlife Estates will be charged US$5,000.00 per claim per quarter to undertake such activities and will register a maximum of one vehicle.
|
|